Sundt’s Mining Experience: More Valuable than Gold

 |  Mining & Industrial
In Superior, Ariz., Sundt is installing a cooling system for Resolution Copper's shaft number 10. The project, located in Superior, Ariz., includes civil, concrete, structural and mechanical components.

Even in the specialized world of industrial construction, mining projects are unique. They are subject to stringent federal regulations as well as high, client-driven standards for safety and quality. Successful mining projects depend on detailed planning, thorough knowledge of specialty systems, piping and equipment construction and mastery of quality requirements.

That’s why mining clients choose Sundt. Our work spans the entire spectrum of mine types at all stages (greenfield, rebuild, reclaimed), and our experience includes constructing and installing rail spurs, roadwork, integrated water treatment facilities, material storage and handling systems, process equipment, crushing and grinding systems and maintenance facilities. We also provide project feasibility estimating and scheduling.

Sundt’s mining industry experts have the knowledge and experience required by these sophisticated and often complex projects. Our safety planning takes priority over production measurements, and we approach every project with a disciplined, detailed preplanning process to provide creative solutions to otherwise standard practices. We staff our projects with the right number of people to maximize safety and efficiency, while ensuring that team members’ skills and project requirements are well-matched.

In addition, Sundt’s diverse workforce has the ability to self-perform major components of all projects, enabling us to ensure on-time and on-budget performance. Our self-perform capabilities include earthwork, yard piping, demolition, concrete, miscellaneous metals, structural steel erection, boilermaker work, process piping and equipment setting.

Below is a summary of some of our recent mining projects:

We are currently working with Resolution Copper to install a cooling system for shaft number 10. The project, located in Superior, Ariz., includes civil, concrete, structural and mechanical components. 

  • Install the number 10 shaft cooling system including the York refrigeration machine, one condenser cooling tower set, concrete structures, steel pipe supports, insulated 24” and 28” VIC pipe, and all required electrical and instrumentation controls.
  • Project Completion – Fall 2012

Sundt recently completed repairs to the Grinding Floor Bridge Crane at an Arizona mine.

  • Repair the grind floor crane’s runway beams, columns and rails to bring them within CMAA standards. The project crews worked 24/7.
  • Project Completion – April 20, 2012

Our mining experts are working with an Arizona mining client to upgrade their fine crusher systems.

  • Rebuild 3 tertiary crushers, 3 Ludowici screens and design-build the primary crusher dust collection system.
  • Scheduled Project Completion – July 30, 2012

Sundt is providing support to an Arizona mine with a temporary batch plant to:

  • Provide and operate portable batch plant to produce redi-mix of 150 to 200 cubic yards per day to support a major mill expansion.
  • Scheduled Project Completion – April  5, 2013