Sundt Projects

Texas Department of Transportation SH 178 Artcraft Road Improvements

Texas Department of Transportation SH 178 Artcraft Road Improvements

  • Location:

    Canutillo, Texas

  • Client:

    State of Texas- Department of Transportation

  • Construction Value:

    $243,747,771

  • Delivery Method:

    Design-Bid-Build (DBB)

  • Year Completed:

    In Progress

  • Specialties:

    Bridges, Roadways

Features & Highlights

  • 104 mast-arm placement columns, up to 55 feet tall to support four new flyover roads across I-10
  • Specialized confined-space safety systems prepared crews and prevented safety incidents
  • Participation with diverse small business enterprises with 6.9% female and 57.8% minority in each trade
  • Collaboration with the city and residents to limit disruptions and maintain traffic operations during construction
Project Overview

The Texas Department of Transportation’s SH 178 Artcraft Road Improvements project is a major transportation investment that will improve mobility and connectivity between the New Mexico state line and I-10 in the El Paso region.

The project team will reconstruct Artcraft Road, providing significant interchange improvements, including reconstruction of an existing overpass, new grade separations, four direct connectors, and U-turn facilities. The project is designed to improve traffic flow and regional accessibility.

Additional improvements include intelligent transportation systems (ITS), traffic signals, roadway lighting, drainage infrastructure, water lines, and sanitary sewer systems. These enhancements will modernize critical transportation infrastructure while supporting safer and more efficient travel throughout the corridor.

The project requires complex phasing and maintenance of traffic operations to keep the roadway functioning throughout construction.

“Our relationship with the owner is great. We’re able to work with them, they work with us, they trust us.”
— Joe Hernandez, Project Manager