|
| Project Name |
Project Description |
Preview |
| 115th Ave. Street Improvements |
Roadway improvements that included extensive utility relocation, storm drainage, water line installation, dry utility ductbanks, and a sanitary sewer trunk line. |
 |
| Avondale, AZ |
| US 60 Widening |
Widening 13 miles of the urban freeway, which included widening 12 bridges, adding carpool and merge lanes, sound walls, lights and overhead message boards. |
 |
| Phoenix, AZ |
| Skyline Drive Widening |
Widening and reconstructing two miles of a heavily used urban roadway, including drainage and utility improvement, raised medians, curb and sidewalk, retaining walls, multi-use lanes, and landscaping. |
 |
| Tucson, AZ |
| I-17 Widening |
Widening seven miles of urban interstate, including the creation of HOV and auxiliary lanes, reconstruction of two bridges, lighting, and the installation of a freeway management system. |
 |
| Phoenix, AZ |
| State Route 202L Red Mountain - Higley to Power |
Construction of 13.2 miles of urban freeway, including three bridges, retaining and sound walls, concrete pavement, asphaltic concrete, drainage, and utilities. |
 |
| Mesa, AZ |
|
|