Project Name Project Description Preview
115th Ave. Street Improvements Roadway improvements that included extensive utility relocation, storm drainage, water line installation, dry utility ductbanks, and a sanitary sewer trunk line.
Avondale, AZ
US 60 Widening Widening 13 miles of the urban freeway, which included widening 12 bridges, adding carpool and merge lanes, sound walls, lights and overhead message boards.
Phoenix, AZ
Skyline Drive Widening Widening and reconstructing two miles of a heavily used urban roadway, including drainage and utility improvement, raised medians, curb and sidewalk, retaining walls, multi-use lanes, and landscaping.
Tucson, AZ
I-17 Widening Widening seven miles of urban interstate, including the creation of HOV and auxiliary lanes, reconstruction of two bridges, lighting, and the installation of a freeway management system.
Phoenix, AZ
State Route 202L Red Mountain - Higley to Power Construction of 13.2 miles of urban freeway, including three bridges, retaining and sound walls, concrete pavement, asphaltic concrete, drainage, and utilities.
Mesa, AZ