| Project Name |
Project Description |
Preview |
| US 60 Widening |
Widening 13 miles of the urban freeway, which included widening 12 bridges, adding carpool and merge lanes, sound walls, lights and overhead message boards. |
 |
| Phoenix, AZ |
| I-17 Widening |
Widening seven miles of urban interstate, including the creation of HOV and auxiliary lanes, reconstruction of two bridges, lighting, and the installation of a freeway management system. |
 |
| Phoenix, AZ |
| State Route 202L Red Mountain - Higley to Power |
Construction of 13.2 miles of urban freeway, including three bridges, retaining and sound walls, concrete pavement, asphaltic concrete, drainage, and utilities. |
 |
| Mesa, AZ |
| US 70 Hondo Valley |
Reconstruction of 38 miles of US 70 from the eastern edge of Ruidoso Downs to Riverside. |
 |
| Ruidoso, NM |
| Agua Fria Freeway Phase 2 |
Construction of eight post-tensioned box girder bridges. |
 |
| Phoenix, AZ |
|
|