Project Name Project Description Preview
Verrado Infrastructure Backbone infrastructure for Phase I of the Verrado master planned community, including seven roadways, two box culvert crossings, and extensive flood control in three washes.
Buckeye, AZ
115th Ave. Street Improvements Roadway improvements that included extensive utility relocation, storm drainage, water line installation, dry utility ductbanks, and a sanitary sewer trunk line.
Avondale, AZ