This project extended the Runway Safety Area on the east end of Runway 7R/25L at Sky Harbor International Airport. The work consisted of relocating and modifying the existing cement-stabilized alluvium bank protection of the north bank of the Salt River, Salt River channel modifications, relocation of existing FAA navigational aid equipment and service road, as well as a new airport perimeter road and security fence.