This project utilized a hopper bottom design that helped maximize the plant's volume while reducing costs.

The Sundt team designed filter equipment that could handle fluctuating levels of arsenic and nitrates, giving the owner long-term flexibility and confidence in the design and operation of the system.

The Town of Gilbert water treatment project included a 1,000 to 1,500 gallon-per-minute (GPM) potable water well; a below-ground, two-million gallon reservoir; and 4,500 GPM dual zone booster pump station, all located on a three-acre.