The project was built in an existing internal courtyard at the facility that was surrounded by buildings on all sides.  The team worked closely with facilities staff to locate the crane, which required the rerouting of the entrance during construction.  The work was completed with minimal impact to existing operations.
This project was a 4,100-square-foot horizontal expansion of the surgery suite on level three of the existing hospital. The expansion accommodates three operating rooms, two substerile rooms, two scrub alcoves, two equipment rooms, three equipment alcoves and a clean holding area. Two of the ORs are Intraoperative CT/ORs with adjacent control, CT Park and equipment rooms.  The interoperative CT equipment installed in this facility was the first of its kind installed in the United States and the prototype was still under development while the building was being expanded.