Sundt and a joint venture partner widened 10 miles of the Loop 202 freeway that runs through Phoenix and Tempe. The $188 million project for the Arizona Department
of Transportation improved traffic flow by adding general purpose lanes along ten miles of the freeway’s eastbound side and approximately two miles along the westbound side.
Twenty-two bridges were widened as part of the project, including a mile-long bridge that spans the Salt River, which Sundt originally constructed in the 1990s. This design-build project was "fast tracked," with a total design and construction schedule of only 600 calendar days.
Client: Arizona Department of Transportation - Main
Architect: TY Lin International - Phoenix
Address: