|
| Project Name |
Project Description |
Preview |
| Cathedral Catholic High School |
A private high school on 53 acres. The 11 buildings total approximately 250,000 square feet and include classrooms, student services, performing arts, athletics, and a chapel/congregation building. |
 |
| San Diego, CA |
| Holy Trinity Catholic Church |
Construction of an 18,800-square-foot church for a new parish. The steel and wood frame structure has a bell tower, church offices and a meeting room. The seating capacity is 750. |
 |
| Cameron Park, CA |
| Tanque Verde Lutheran Church Family Life Center |
A 23,000-square-foot multi-purpose building, which has four educational classrooms and additional office space. The project was part of the Family Life Center/Admin Building expansion. |
 |
| Tucson, AZ |
| St Andrews Church Expansion |
Construction of a two-level, 34,500-square-foot sanctuary, including a below-grade basement. The project included interior and exterior remodeling of the Fellowship Hall. |
 |
| Tucson, AZ |
| University Covenant Church |
Construction of a new 16,000-square-foot, multi-purpose facility including a two-story administration and education wing. |
 |
| Davis, CA |
|
|